ELIJAH 's Resume

A PHP Error was encountered

Severity: Warning

Message: Undefined array key "video"

Filename: views/smartcv_web.php

Line Number: 80

Backtrace:

File: /var/www/html/application/modules/webresume/views/smartcv_web.php
Line: 80
Function: _error_handler

File: /var/www/html/application/third_party/MX/Loader.php
Line: 363
Function: include

File: /var/www/html/application/third_party/MX/Loader.php
Line: 304
Function: _ci_load

File: /var/www/html/application/modules/webresume/controllers/Webresume.php
Line: 60
Function: view

File: /var/www/html/index.php
Line: 317
Function: require_once

PIPING ENGINEER

Summary

Piping Engineer with more than 10 years of experience planning developing and implementing industrial piping systems. Action-oriented with strong ability to communicate effectively with executive public and business audiences. To execute the knowledge and information into work and achieve success by making efforts to take the company to great heights. It should allow me to utilize knowledge and skills in the best possible way and should provide an opportunity to grow while contributing towards organizational growth.

Work Experience
Mar 2011 - Present
Industrial Design Ltd

piping engineer

New Cityland

  • Research new technologies and assess feasibility for inclusion in new concepts.
  • Collaborate closely with procurement teams and suppliers on deliveries.
  • Confer with engineers to implement operating procedures and resolve system malfunctions.
  • Specify system components or direct modification of products to ensure conformance with engineering design and performance specifications.
  • Provide engineering perspective in meetings regarding overall project interactions and issues.
  • Identified design process and equipment options to satisfy client needs minimize costs and limit potential operational problems.
  • Maintained timely and technical reports regarding assigned engineering activities.
  • Upheld open and effective communications with project teams to increase productivity.
  • Responsible of plan, organize, execution of piping fabrication and erection works
  • Allocation of material, man power and equipment for daily work activities
  • Monitor all piping installation and modification activities
  • Ensure the productivity and high quality of the subordinates and the sub-contractors activities
  • Provided “flanged-joints tightening” demonstration to 120 supervisors and team leaders

Apr 2006 - Jan 2010
JB Designs

piping engineer

New Cityland

  • Conducted research to test and analyze system feasibility design operation and performance.
  • Wrote protocols qualification documents and test plans to maximize quality assurance.
  • Conferred with engineers and other personnel to implement operating procedures resolve system malfunctions and provide technical information.
  • Led cross-functional team to share technology across departments to improve operational efficiency.
  • Continually improved processes measurement documenting and work flow techniques.

Aug 2004 - Mar 2006
ILM Piping Systems

piping engineer

New Cityland

  • Recommended design modifications to eliminate bottlenecks and malfunctions.
  • Identified design process and equipment options to satisfy client needs minimize costs and limit potential operational problems.
  • Maintained timely and technical reports regarding assigned engineering activities.
  • Upheld open and effective communications with project teams to increase productivity.

Education
Aug 2004 - Mar 2006
B.Sc. - Mechanical Engg.
8.0 CGPA

University of California

CA